介绍了建筑工程变更的含义,分析了工程变更对工程项目的影响,从固定总价合同变更计价、固定单价合同变更计价、完善合同条款等方面,阐述了基于工程变更的合同管理措施,旨在保证工程的顺利进行。
The paper introduces the concept of the architectural engineering alteration,analyzes its influence on the engineering programs,and illustrates the contract management based on the engineering alteration from the altered pricing in fixed total price contract,altered pricing in fixed single price,and improvement of contract clauses,so as to ensure the smoothness of the projects.
出处
《山西建筑》
2016年第20期251-252,共2页
Shanxi Architecture
关键词
工程变更
合同管理
固定总价合同
固定单价合同
engineering alteration
contract management
fixed total price contract
fixed single price contract