期刊文献+

On the design and selection of vehicle coordination policies for underground mine production ramps

On the design and selection of vehicle coordination policies for underground mine production ramps
下载PDF
导出
摘要 Traffic management in underground mines,especially on production ramps,is a difficult problem to optimize and control.Most operations use one of a few common policies;e.g.,the so-called ‘‘lock-out" and‘‘loaded-vehicle-priority" policies.The work presented in this paper uses discrete-event simulation to study the efficiency of multiple policies.Based on simulation results,an improvement to the common lock-out policy is proposed.This new policy utilizes the rules of the lock-out policy but integrates an option that allows a group of vehicles to be given temporary priority in a certain direction of travel.Quantitative results are provided and,based on these,a systematic technique for ramp design that aims to optimize the efficiency of underground mine ramp traffic flow is described. Traffic management in underground mines, especially on production ramps, is a difficult problem to opti- mize and control. Most operations use one of a few common policies; e.g., the so-called "lock-out" and "loaded-vehicle-priority" policies. The work presented in this paper uses discrete-event simulation to study the efficiency of multiple policies. Based on simulation results, an improvement to the common lock-out policy is proposed. This new policy utilizes the rules of the lock-out policy but integrates an option that allows a group of vehicles to be given temporary priority in a certain direction of travel. Quantitative results are provided and, based on these, a systematic technique for ramp design that aims to optimize the efficiency of underground mine ramp traffic flow is described.
出处 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第4期623-627,共5页 矿业科学技术学报(英文版)
基金 funded by the Natural Science and Engineering Research Council of Canada (NSERC) under project CRDPJ 44SBO4-12 funding provided by Barrick Gold Corporation and Peck Tech Consulting Ltd
关键词 Underground mining Fleet managementRamp design Equipment selection Discrete-event simulation 矿山生产 协调策略 车辆 设计 坡道 离散事件仿真 地下矿山 交通管理
  • 相关文献

参考文献2

二级参考文献29

  • 1Elevli B, Demirci A, Dayi O. Underground haulage selection: shaft or ramp for a small-scale underground mine. J S Aft lnst Min Metall 2002;102:255-60.
  • 2McCarthy PL, Livingstone R. Shaft or decline an economic comparison. AIG Bull 1993;14:45-56.
  • 3Hustrulid, William A, Richard L. Underground mining methods. 1st ed. Englewood, Colorado: Society for Mining, Metallurgy, and Exploration (SME); 2001.
  • 4Sturgul JR, Jacobsen WL, Tecsa TL. Modeling two-way traffic in an underground one-way decline. In: Proceeding 5th Int Syrup Mine Plan Equip Sel. Sao Paulo; 1996. p. 87-90.
  • 5Vagenas N. Dispatch control of a fleetof remote-controlled automatic load- haul-dump vehicles in underground mines, lnt J Prod Res 1991 ;29:2347-63.
  • 6Beaulieu M, Gamache M. An enumeration algorithm or solving the fleet management problem in underground mines. Comput Oper Res 2006;33(6): 1606-24.
  • 7Gamache M, Cohen P, Grimard R, Bigras LP. Fleet management system for underground mines. CIM Bull 2004;97:66-70.
  • 8Gamache M, Grimard R. Cohen E A shortest-path algorithm for solving the fleet management problem in underground mines. Eur J Oper Res 2005;166: 497-506.
  • 9Bigras LP, Gamache M. Considering displacement modes in the fleet management problem, lntJ Prod Res 2005;43:1171-84.
  • 10Frank O. Two-way traffic on a single line of railway. Oper Res 1966;14:801-11.

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部