井下泥水平衡顶管掘进装置泥水系统设计

Design of Slurry System for Slurry Balanced Pipe Jacking Machine in Coal Mine
原文传递
导出
摘要 泥水系统作为泥水平衡顶管掘进技术核心,一直以来缺少其在井下方面的研究。结合前人的工程经验与矿井下施工特点,提出一套适用井下施工的泥水系统设计方法,包括管径、流速、流量的确定,管阻的计算,泵的选型,以及采用高效的泥浆处理系统。在实际井下施工过程中发现,设计的泥水系统运行稳定,带渣能力强,进而验证了工艺设计的可行性。 Slurry system is the core of slurry balance pipe jacking technology,the researches on which are scarce in coal mine all along.Combined with previous engineering experience and environmental characteristics of coal mine,the slurry system design suited for coal mine construction was presented,including determination of the pipe diameter,flow velocity and flow rate,calculation of pipe resistance,selection of the pump and application of the high efficient mud treatment system. In the actual construction process in coal mine,the slurry system runs stably and has strong ability to carry muck,which verifies the feasibility of the process design method.
作者 王雷
出处 《煤矿安全》 CAS 北大核心 2016年第7期143-146,共4页 Safety in Coal Mines
关键词 巷道掘进 泥水平衡 顶管机 泥水输运 泥水分离 临界沉降流速 roadway excavation slurry balance pipe jacking slurry transport slurry separation critical settling velocity
  • 相关文献

参考文献8

二级参考文献10

共引文献63

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部