期刊文献+

红庆梁煤矿井筒建设时期粉尘治理方案 被引量:1

Dust Control Scheme During Shaft Construction in Hongqingliang Coal Mine
原文传递
导出
摘要 针对红庆梁煤矿井筒施工过程存在的粉尘危害问题,通过研究矿井井筒建设时期粉尘的性质行状、产生粉尘的环节、粉尘源的产生粉尘机理、粉尘在井筒的逸散规律,对除尘方案的对比和优化,设计了红庆梁煤矿井筒掘进期间气水2路喷雾除尘技术方案,为煤矿井筒建设时期提供了安全技术保障,消除了粉尘隐患,减少了安全事故发生。 For the problem of dust hazard during shaft construction in Hongqingliang Coal Mine,through studying dust characters,producing links,producing dust mechanism of dust sources,dust emission laws and comparison and optimization of dust removal schemes in mine shaft during construction period,we design gas-water two-way spray dust removal technology scheme in shaft excavation of Hongqingliang Coal Mine,which provides safety technology during mine shaft construction period,eliminates hidden dangers of dust,and decreases the occurrence of safety accidents.
作者 付文俊 彭伟
出处 《煤矿安全》 CAS 北大核心 2016年第7期163-165,共3页 Safety in Coal Mines
基金 天地科技公司研发资助项目(KJ-2014-BJZM-02)
关键词 井筒掘进 粉尘危害 除尘技术 粉尘治理 粉尘监测 shaft excavation dust hazard dust removal technology dust control dust monitoring
  • 相关文献

参考文献7

二级参考文献54

共引文献101

同被引文献2

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部