蓬莱市北沟污水处理厂二期工程设计

Design of Second-stage Project of Beigou Sewage Treatment Plant in Penglai City
原文传递
导出
摘要 北沟污水处理厂二期工程设计规模为1.0×10~4m^3/d,其进水中70%为印染、染料中间体及化工废水。设计采用以预处理+PAC多模式A^2/O+深度处理为主体的工艺。从2015年1月一12月的运行数据来看,该工艺处理效果较好,运行稳定,实际出水水质优于设计值(一级A排放标准)。详细介绍了各单元的设计参数,并通过对运行数据进行分析,总结了设计、运行经验。 The design capacity of the second-stage project in Beigou STP was 1.0 × 104 m3/d, in which the printing and dyeing wastewater, dye intermediate wastewater and chemical wastewater accoun- ted for 70%. The combined process of pretreatment, PAC multi-mode A2/O and advanced treatment was used as the main process. The operation results from January to December 2015 showed that the com- bined process had good treatment effect and stable operation. The actual effluent quantity was better than that in the design (the first level A criteria in the national wastewater discharge standard). The design parameters of each unit were introduced, the operation data were analyzed, and the experience in design and operation was summarized.
出处 《中国给水排水》 CAS CSCD 北大核心 2016年第14期52-55,共4页 China Water & Wastewater
关键词 印染废水 染料中间体废水 化工废水 Fenton高级氧化 printing and dyeing wastewater dye intermediate wastewater chemical waste-water Fenton advanced oxidation
  • 相关文献

参考文献2

二级参考文献4

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部