摘要 巴基斯坦塔贝拉水电站四期扩建工程下游直腹式钢板桩围堰,存在超30m水深条件下光滑的钢板桩围堰桩格与无衔接埋件的原有混凝土边墙衔接的问题。在工程实践和衔接方案比选研究的基础上,提出了采用砂砾石围堰段结合高喷混凝土防渗墙与钢板桩刺墙的新型衔接方案,并从施工质量分析、设计要点、施工工艺、施工效果等方面介绍了该衔接方案。工程实践结果表明,衔接段的结构稳定性和抗渗稳定性良好,可为相关工程的设计和施工提供参考。 Straight web steel sheet pile downstream cofferdam of Tarbela stage-4extension hydropower project construction is located in Pakistan.A problem of the project was how to joint the slick steel sheet pile with the existing concrete wall without embedded parts in the condition of over 30 mdeep water.Based on engineering practices and program comparison studies,the joint type of gravel cofferdam combined with high-pressure jet grouting and junction piles was proposed.The paper introduced this joint type from analysis of construction quality,design points,construction technology,and construction effect.Project practice results show that the joint section of cofferdam has good structural stability and seepage stability,which can provide reference for design and construction of the related engineering.
出处 《水电能源科学》 北大核心 2016年第7期127-130,共4页 Water Resources and Power
基金 国家自然科学基金项目(51379164)
关键词 塔贝拉水电站 钢板桩围堰桩格 混凝土边墙 衔接型式 Tarbela Hydropower Station steel sheet pile cell concrete wall joint type
  • 相关文献

参考文献8

  • 1刘芳,张国庆,蒋明镜,熊巨华,中山裕章.钢板桩挡墙主动土压力分布的形状效应[J].岩土力学,2012,33(S1):315-320. 被引量:9
  • 2Michael Ciammaichella, James Tantalla. Tempora- ry Cellular Cofferdam Design, Installation~Removal Willow Island Hydroelectric Project [ C]//Muser Rutledge Consulting Engineers. USA: HydroVision International, 2014.
  • 3Flett I D, Carter M, Hussain N, et al. Incheon Bridge Project-The Role of the Contractor's Chec- king Engineer[C]//IABSE Symposium Report. In- ternational Association for Bridge and Structural Engineering. Switzerland.. IABSE, 2007..41-47.
  • 4Mejilliones Chile. Breakwater and Quay Constrution [EB/OL]. http..//sheetpiling, arcelormittal, corn/ uploads/files/ACRPS. Mejillones%20% 20Chile. pdf,2015 08-28.
  • 5郑守仁.葛洲坝水利枢纽钢板桩格型围堰设计[J].人民长江,1980(1):6—21,47.
  • 6熊盛立.龚嘴水电站消力塘整治工程的深水围堰--钢板桩围堰的设计与施工[J].水电站设计,1987(2):58-64.
  • 7郑守仁.三峡工程二期横向围堰防渗墙设计及施工技术[J].人民长江,1997,28(5):1-3. 被引量:2
  • 8EMl110-2-2503, Design of Sheet Pile Cellular Struetures[S]. Washington D C.. Department of the Army US Army Corps of Engineers, 1989.