摘要
介绍了福州某地铁车站半盖挖顺作工法下盾构平移相关配套技术,针对盾构井内主体结构、盾构井上方铺盖系统托换、标准段主体结构预留、临时格构柱防水处理等方面提出相关处理措施,以期对同类型的地铁车站设计有所帮助。
This paper introduced a complete set of techniques of shield-translating of semi-covered excavation subway station in Fuzhou,provided treatment measures of main structure in shield well,underpinning measures of cover system,reserved measures in standard segment,waterproof treatment of temporary lattice column,in order to help the same type subway station design.
出处
《工程质量》
2016年第7期55-58,共4页
Construction Quality
关键词
地铁车站
半盖挖顺作
盾构平移
技术措施
subway station
half cover excavation
shield translation
technical measures