摘要
针对铁路工程信息系统特点,结合近几年南昌铁路局新建铁路提前介入建设项目工作经验,此文对信息专业提前介入建设项目工作中存在的问题进行分析,通过分析与研究,提出应对措施。为进一步做好提前介入建设项目的工作,分工程设计阶段和施工阶段阐述了提前介入建设项目的工作要点和关键点,保证工程建设质量,提高铁路运输效率。
According to the characteristics of railway engineering information systems,the problems existing in the early intervention of information major in railway construction project is analyzed in this paper combined with the early intervention work experience in newly built railway construction project of Nanchang railway administration. Through analysis and research,measures to deal with the problems are put forward.In order to further improve the early intervention work,the work points and key points of the early intervention work in design and construction stage of construction project is described,which is to ensure the quality of construction and improve the efficiency of railway transport.
出处
《铁路工程造价管理》
2016年第4期26-29,共4页
Railway Engineering Cost Management
关键词
铁路工程
信息专业
提前介入
工作要点
Railway engineering
Information major
Early intervention
Work points