富池口泵站进口整流试验研究 被引量:2

Experimental Study on the Intake Flow Rectification in Fuchikou Pumping Station
下载PDF
导出
摘要 鉴于富池口泵站前池是典型的侧向进流,使得泵站10台机组进流分部不均,特别是靠近引水渠的2台机组,进水流量偏少,水流条件差,进口易形成立轴旋涡引起机组运行振动,降低了机组运行效率和使用寿命问题,通过模型试验研究,确定了合理的曲线导流墩布置方案,能有效地进行分流导流,明显改善了整个泵站进口的水流条件,使得各机组进流量分配均匀,水流平顺,基本消除了进口回流和旋涡。 The intake water flow of the forebay in Fuchikou Pumping Station is a typical lateral type , which causes an uneven intake flow situation of ten pump units .Two units near the diversion canal are of the worst situation with insuffi-cient flow and bad flow conditions .Vertical vortex could be induced in this situation and it could cause shaking of the u-nits which will reduce their operation efficiency and service life .Thus, an experimental study is carried out to determine a reasonable arrangement of the curved flow diversion piers , which is able to improve the flow situation .It shows that a much more balanced and smooth flow is obtained and the reflux and vortex are largely eliminated with the improved scheme.
出处 《水电与新能源》 2016年第7期6-11,共6页 Hydropower and New Energy
关键词 泵站 导流墩 模型试验 pumping station flow diversion piers model experiment
  • 相关文献

参考文献3

  • 1武汉大学设计研究总院,湖北金浪勘察设计公司.富池口泵站更新改造工程初步设计报告(审定修订本)[R].武汉:武汉大学设计研究总院,2007.
  • 2武汉大学水资源与水利水电科学国家重点实验室.阳新县富池口泵站进水口分水导流墩水工模型试验报告[R].武汉:武汉大学,2007.
  • 3南京水利科学研究院.水工模型试验[M].北京:水利电力出版社,1985..

共引文献25

同被引文献17

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部