期刊文献+

一种管理友好型配电网相量量测单元优化配置模型 被引量:4

A Management-Friendly Optimization Model of Phasor Measurement Unit Configuration in Distribution Power Systems
下载PDF
导出
摘要 随着智能电网的发展,大量分布式电源的接入对配电网的监测提出了更高的要求。使用整数线性规划对电力系统可观测性进行建模,提出了一种管理友好型相量量测单元优化配置模型。该模型的线性特性保证了解的全局最优性,针对变电站、电厂的相量量测单元配置方案使得优化结果更易于实际工程实现。对IEEE标准系统及实际配电网的仿真结果验证了该模型的有效性与实用性,与其他文献结果的对比体现了该模型的优越性。 With the development of smart grid, the increased integration of distributed generation has higher requires on distribution system monitoring. This paper presents a management-friendly optimization model of phasor measurement units by using integer linear programming method to build the model of power system observability. The linearity of the model guarantees global optimality of the solutions and makes the optimization results easier to implement in accordance with configuration scheme for phasor measurement unit of substation and power plant. The simulations on IEEE standard systems and a practical distribution system show the effectiveness and practicability of the proposed model. The comparison with previous approaches shows the superiority of the proposed model.
作者 董建达
出处 《浙江电力》 2016年第7期8-11,19,共5页 Zhejiang Electric Power
关键词 相量测量单元 整数线性规划 优化配置 可观测性 配电网 PMU(phasor measurement unit) ILP(integer linear programming) optimal configuration observability distribution system
  • 相关文献

参考文献8

  • 1肖世杰.构建中国智能电网技术思考[J].电力系统自动化,2009,33(9):1-4. 被引量:595
  • 2BROWN R E.Impact of Smart Grid on Distribution Sys- tem Design[ C ]//Power And Energy Society General Meet- ing-Conversion And Delivery of Electrical Energy In The 21st Century. Pittsburgh: [S.N.],2008:1-4.
  • 3JIYUAN FAN, BORLASE S.The Evolution of Distribution[ J].IEEE Power and Energy Magazine,2009,7(2):63-68.
  • 4PHADKE A G.Synchronized Phasor Measurements in Power Systems[J].IEEE Computer Applications in Power, 1993,6(2):10-15.
  • 5R SODHI,S C SRIVASTAVA,S N SINGH.Optimal PMU Placement to Ensure System Observability under Contin- gencies[ C ]. Power & Energy Society General Meeting, Calgary, AB, 2009.
  • 6李大虎,曹一家,江全元,占震滨.基于多目标进化算法的相量测量单元优化配置[J].电网技术,2005,29(22):45-49. 被引量:11
  • 7鲍威,蒋雪冬,陈利跃,卢敏,郭瑞鹏.考虑观测冗余度最大的0-1线性规划电力系统PMU最优配置[J].电网技术,2014,38(8):2051-2056. 被引量:12
  • 8SADEGH AZIZI,AHMAD SALEHI DOBAKHSHARI,S ARASHNEZAM SARMADI,et al.Optimal PMU PLace-ment by an Equivalent Linear Formulation for Exhaustive Search[J].IEEE Trans on Smart Grid,2012,3(1):174-182.

二级参考文献55

  • 1李大虎,曹一家,江全元,占震滨.基于多目标进化算法的相量测量单元优化配置[J].电网技术,2005,29(22):45-49. 被引量:11
  • 2EPRI.Power delivery system and electricity markets of the future,1009102[R].Palo Alto,CA,USA:EPRI,2003.
  • 3EPRI.Technical and system requirements of advanced distribution automation,1010915[R].Palo Alto,CA,USA:EPRI,2004.
  • 4EPRI.Profiling and mapping of intelligent grid R&D programs,1014600[R].Palo Alto,CA and EDF R&D,Clamart,Frances:EPRI,2006.
  • 5U.S.Department of Energy,National Energy Technology Laboratory.Modern grid initiatives a vision for modern grid[EB/OL].[2008-10-10].http://www,netl.doe.gov/moderngrid/docs.
  • 6European Commission.European technology platform smart grids:vision and strategy for Europe's electricity networks of the future[EB/OL].[2008-10-10].http://ec.europa.eu/research/energy/pdf/smar tgrids_en,pdf.
  • 7VON DOLLEN D.lntelliGrid:enabling the power delivery system of the future// Proceedings of 9th International Symposium on Power-Line Communications:ISPLC2005,April 6-8,2005,Vancourer,Canada.
  • 8The National Energy Technology Laboratory.A systems view of the modern grid.Pittsburgh,PA,USA:NETL,2007.
  • 9The National Energy Technology Laboratory.The modern grid initiative.Pittsburgh,PA,USA:NETL,2007.
  • 10Research Reports International.Understanding the smart grid,RRI00026[R].2007.

共引文献615

同被引文献43

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部