期刊文献+

江津成品油输油管道某站场地基强夯处理研究

Study on soft soil foundation treatment by the dynamic compaction of product oil pipeline yard in Jiangjin
下载PDF
导出
摘要 结合重庆市江津区成品油输油管道站场拟建区的地质条件,采用强夯法对该场地的软土层进行了地基加固处理,通过监测,分析了强夯点的沉降量和空虚水压力变化规律,并对比了不同强夯方案下的孔隙水压力和沉降变化规律,经固结试验表明,相同的强夯能量作用下,采用锤重12 t和落距10 m的方案压实效果更好。 Combining with the proposed product oil pipeline station geology conditions in Jiangjin region of Chongqing city,the paper carries out soft stratum consolidation treatment by applying dynamic compaction method,analyzes the settlement volume of the dynamic compaction point and void water pressure changing law through monitoring,and compares pore water pressure and settlement changing law under different dynamic compaction schemes.The consolidating experiment shows that:under the action of similar dynamic compaction energy,the dynamic compaction effect will be better by applying the scheme of 12 t of hammer and 10 m of settling distance.
出处 《山西建筑》 2016年第21期65-67,共3页 Shanxi Architecture
基金 西南科技大学博士基金项目(项目编号:14zx7135)的资助
关键词 输油站场 强夯方案 软土地层 沉降变形 oil-transportation station dynamic compaction scheme soft-soil stratum settlement deformation
  • 相关文献

参考文献5

二级参考文献26

共引文献180

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部