摘要
介绍了建筑工程变更及现场签证的定义,从建设、设计、施工、监理等环节,分析了工程项目建设各参与主体对工程变更及现场签证的影响,并提出了全方位的控制措施,以实现对工程变更及签证的有效控制。
The paper introduces the definition of the architectural engineering variation and site order,from the building,design,construction,supervision and other aspects,analyzes the influence of the construction participants of the engineering programs on the engineering variation and site order,and points out the all-round controlling measures,so as to realize the effective control over the engineering variation and site order.
出处
《山西建筑》
2016年第21期221-223,共3页
Shanxi Architecture
关键词
工程变更
现场签证
造价管理
engineering variation
site order
cost management