结合工作经验及相关文献,分析了施工质量管理中,建设单位、监理单位、勘察设计单位以及施工单位的主要责任和义务,并提出了进度管理的要求和措施,为今后建筑工程质量和进度管理提供了整体的思路和方法。
In this paper,combined with engineering experience and relevant literature,analysis of construction quality management in construction units,supervision units,survey and design units and the primary responsibility and duty construction units,and to submit progress management requirements and schedule management measures for the future quality of construction progress and provide overall management ideas and methods.