摘要
结合广州某预应力混凝土T型刚构桥的病害情况,介绍了该旧桥的拆除工艺,并建立了全桥的三维仿真分析模型,计算了各拆除工况下桥梁结构的受力情况,保证了桥梁拆除施工的安全性。
Combining with the diseases on some prestressed concrete T-shaped stiff bridges in Guangzhou,the paper introduces the demolition crafts of the old bridge,establishes the three-dimension simulation analysis model of the bridge,and calculates the stressed status of the bridge structure under all kinds of demolitions,so as to ensure the safety of the bridge demolition.
出处
《山西建筑》
2016年第22期157-158,共2页
Shanxi Architecture
关键词
T型刚构桥梁
拆除工艺
结构体系
应力
T-shaped stiff bridge
demolition craft
structural system
stress