洪屏电站施工阶段的执行概算和合同执行管理 被引量:3

Management on Investment Budget Control and Contract Execution in Construction Stage of Hongping Pumped-storage Power Station
下载PDF
导出
摘要 江西洪屏抽水蓄能电站施工区域广,地质结构复杂,地下水极其丰富,防渗体系要求高,电站建设面临许多投资控制的难点和重点。针对这些问题,通过编制执行概算、合同执行分析等措施,对设计、变更、索赔、完工结算等投资控制的核心进行了有效的管控,使得工程各项投资在概算费用内,实现了投资控制的目标。 The construction of Hongping Pumped-storage Power Station is faced with many difficulties in investment control as wide construction area, complex geological structure, extremely rich groundwater and high demand on seepage control system. To solve these problems, the investments in project design, changes, claims and completion settlement are effectively controlled through preparing executing budget and analyzing contract execution. These measures make the project investment within budgetary estimate of costs and achieve the goal of investment control.
出处 《水力发电》 北大核心 2016年第8期13-15,共3页 Water Power
关键词 投资控制 施工阶段 合同执行分析 洪屏抽水蓄能电站 investment control construction stage contract execution analysis Hongping Pumped-storage Power Station
  • 相关文献

同被引文献18

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部