摘要
秀涂人工岛是以泉州湾内的鞋沙浅滩为依托,在鞋沙浅滩西、北、东侧建设围堰,在南侧建设码头岸壁,围成闭合区域后吹填前方水域的疏浚土而形成的。对秀涂人工岛的总体设计情况及关键技术进行总结分析,包括平面形状、平面布置及分期实施方案、围堰结构、码头结构、陆域形成等人工岛设计的主要方面,可供类似工程参考。
Based on the Xiesha shoal in Quanzhou bay, north and east of Xiesha shoal and a quay wall in the south of cofferdam and the quay wall, is baekfilled by the sand dredged it is proposed to construct cofferdams in the west, Xiesha shoal.The closed region, surrounded by the from front waters.Thus the cofferdam, the quay wall and the backfilled sand form the Xiutu artificial island.This paper analyzes the general design and key technologies related to the design of the Xiutu island, which contains the plane layout, plane arrangement, phased implementation plan, cofferdam structure, wharf structure, land formation and other major aspects related to the design of the artificial island.This study will provide reference for similar projects.
出处
《水运工程》
北大核心
2016年第7期36-39,共4页
Port & Waterway Engineering
关键词
人工岛
总体布置
码头
围堰
陆域形成
artificial island
general arrangement
wharf
cofferdam
land formation