期刊文献+

Revit to Navisworks实例分析数据对接处理 被引量:1

Case Analysis of Data Connection on Revit to Navisworks
下载PDF
导出
摘要 Autodesk是世界领先的设计软件和数字内容创建公司,其开发的CAD系列产品被称为建筑行业的第一次革命。随着科技发展及行业进步,建筑业方案设计3D可视化、仿真分析及4D施工动态模拟呈现蓬勃发展的趋势。我国建筑行业正处于一个转型阶段,二维平面设计逐步向3D数字模型设计过度,数据接口及数据对接仍然是一个亟待解决的问题。本文通过实际案例,阐述了Revit2014软件3D模型数据文件的一些参数问题及Navisworks2014中4D施工模拟关于Project2010工程数据的定义、匹配问题;总结了Revit2014三维建筑模型数据对接Navisworks2014的一些建议,为BIM(Building Information Model)技术应用提供参考依据。 Autodesk is a world-wide leading software corporation for the engineering and graphic design, the CAD packages of which are regarded as the first revolution in the construction industry. With advances in technology and industry, there is booming trend of 3D visualization on construction design, and appears the simulation analysis and dynamic 4D simulation. The pattern of 2D graphic design to 3D models is gradually arisen, which marks the transition phase in the construction industry in China. Data interface and data connection is still a serious problem. Through practical cases, the paper expounds on the problems about the parameter of 3D model data designed by Revit2014 and the definition and matching of engineering data of project2010 for the 4D simulation on Navisworks2014. The paper puts forward some suggestions on importing 3D building model data from Revit2014, providing reference for the BIM(Building Information Model) technology.
作者 彭笑川 刘丽
出处 《科技广场》 2016年第6期29-32,共4页 Science Mosaic
关键词 4D施工动态模拟 Project项目数据 数据对接 数据匹配 4D-Construction Simulation Project Engineering Data Data Connection Data Matching
  • 相关文献

参考文献8

  • 1Kathleen McKinney, Jennifer Kim, Martin Fischer.Inter- active4D-CAD[M].New York:Computing in Civil Engineering, 1996.
  • 2Frank Vaugn.3D&4D sign-Build Projects [M].New neering, 1996. Modeling on Commercial De- York:Computing in Civil Engi-.
  • 3EricCollier,Martin Fisher.Visual-Based Scheduling:4D Modeling on the San Mateo County Health Center [M].New York:Computing in Civil Engineering, 1996.
  • 4K M Liston, M Fischer,J Kunz.4D Annotator:A visual decision support tool for construction planners[C].Computing in Civil Engineering,Proceedings of International Computing Congress, Boston, ASCE, 1998.
  • 5T Froese,M Fischer, F Grobler,et al. Industry founda- tion classes for project management--a trial implementation[J]. Electronic Journal of Information Technology in Construction, 1999, (04) : 17-36.
  • 6C Kam, M Fischer, R Hanninen, et al. The product mod- el and fourth dimension project [J].ITcon, Special Issue IFC - Product Models for the A EC Arena, 2003, (08): 137-166.
  • 7韩宁,牟茗.Navisworks在建筑信息模型(BIM)技术中应用的研究[A].2008年全国高校建筑数字技术教学研讨会论文集[C].2008.
  • 8陈科字,刘占省,张桐睿,等.Navisworks在徐州体育场施工动态模拟中的应用[A].第十三届全国现代结构一程学术研讨会论文集[C].2013.

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部