摘要
对某热电厂曝气生物滤池的接种驯化、挂膜启动、满负荷运行3个调试启动期间出水COD、NH3-N含量及其去除率进行有效分析研究。结果表明当曝气生物滤池进水COD、NH3-N含量分别稳定在40mg/L、50mg/L时,出水COD≤10mg/L、NH3-N≤5mg/L,COD去除率达到75oA~85%,NH3-N去除率达到85%~959/6,出水水质满足后续工艺使用要求。
During the biological aerated filter of a thermal power plant commissioning start-up period, including inoculation and acclimation, biofilm star-up and full load operation three stages the content and removal rate of COD and NH3--N in the effluent water were analyzed and studied. The result showed that when the inflow COD and NH3-N content were stable in the 40 mg/L, 50 mg/L, the effluent COD≤10 mg/L, NH3-N≤ 5 mg/L, removal rate COD reached 75% to 85% and NH3-N 85% to 95%, effluent water quality meet the follow-up process requirements.
出处
《给水排水》
CSCD
北大核心
2016年第8期70-74,共5页
Water & Wastewater Engineering
关键词
曝气生物滤池(BAF)
氨氮
有机物
启动
Biological aerated filter(BAF)
Ammonia nitrogem Organic
Start-up