工程质量保证金返还的阻滞问题及对策研究——基于风险管理视角 被引量:1

Research on Blocking Problems and Countermeasures of Retention Money Returning:Based on the Perspective of Risk Management
下载PDF
导出
摘要 在我国建筑市场中,工程质量保证金不能按时足额返还的现象屡见不鲜。基于风险管理理论,从现有文献中识别出阻滞工程质量保证金按时足额返还的两类风险,分别为质量保证金制度缺陷风险和质量缺陷责任界定风险;然后分析两类风险产生的根源,同时提出两类风险的应对措施,以期更大程度地解决质量保证金不能按时足额返还的问题。 In the construction market of our country,the phenomenon that contractors can not return retention money in full and on time is common. Based on the theory of risk management,this paper identifies the two types risk of that retention money can't be returned from the existing literature,namely quality guarantee system defect risk and quality defects liability defines risk. Then,analyzes the root of the two types of risk,puts forward response measures to two types of risk,in order to further solve the problem of retention money can't be returned in full and on time.
出处 《建筑经济》 2016年第8期53-57,共5页 Construction Economy
基金 国家自然科学基金项目"关系治理对EPC工程供应链界面有效性的影响机理研究"(71202010)
关键词 风险管理 质量保证金 缺陷 返还 risk management retention money defect return
  • 相关文献

参考文献12

二级参考文献20

  • 1韩同银,王淑雨.完善我国工程质量保修制度的思考[J].建筑经济,2004,25(9):9-12. 被引量:8
  • 2[1]中华人民共和国建筑法[M].北京:法律出版社,1997.
  • 3[2]中华人民共和国产品质量法[M].北京:法律出版社,1998.
  • 4[3]中华人民共和国刑法[M].北京:法律出版社,1997.
  • 5建设部,财政部.关于印发《建设工程质量保证金管理暂行办法》的通知.建质[2005]7号,2005-01-12.
  • 6财政部.关于印发《基本建设财务管理规定》的通知.财建[2002]394号,2002—09—27.
  • 7财政部,建设部.建设工程价款结算暂行办法.财建[2004]369号.2004—10—24.
  • 8宋斌等.2001年最新建设合同示范文本应用手册(上)[M].兵器工业出版社.2001.
  • 9宋斌等.2001年最新建设合同示范文本应用手册(中)[M].兵器工业出版社.2001.
  • 10宋斌等.2001年最新建设合同示范文本应用手册(下)[M].兵器工业出版社.2001.

共引文献18

同被引文献5

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部