高墩多跨连续刚构桥施工技术与应用策略

Construction Technology and Application Strategy of High Pier Multi Span Continuous Rigid Frame Bridge
下载PDF
导出
摘要 随着我国经济的快速发展,高墩多跨连续刚构桥的施工越来越多。对高墩多跨连续刚构桥的具体施工技术及难点进行分析,阐述了在施工中应该注意的问题,提出相应的应对策略,以期能够对高墩多跨连续刚构桥的施工提供参考。 With the rapid development of our country 's economy,the construction of high pier multi span continuous rigid frame bridge is more and more. The analysis on specific construction technologies and difficulties of high pier multi span continuous rigid frame bridge is made,issues needing attention during the construction are elaborated,and corresponding coping strategies are put forward,so as to provide reference for the construction of high pier multi span continuous rigid frame bridge.
作者 高志刚
出处 《北方交通》 2016年第7期53-55,共3页 Northern Communications
关键词 高墩多跨 连续刚构桥 施工技术 应用策略 High pier multi span Continuous rigid frame bridge Construction technology Application strategy
  • 相关文献

参考文献8

二级参考文献45

共引文献81

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部