摘要
阐述了煤矿综采工作面设备安装的基本概念,论述了综采工作面设备安装的一些准备工作,提出了综采工作面设备安装工艺的具体优化策略,旨在提升煤矿综采工作面设备安装工艺水平,保证矿业生产人员的生命安全。
This paper indicates the basic concepts of the fully mechanized coal face equipment installation, discusses some preparatory works of the fully mechanized mining face equipment, and proposes fully mechanized mining face equipment installation process specific optimization strategy, which aims to enhance the fully mechanized coal face equipment installation process standards and to ensure the life safety of the mining production.
出处
《机械管理开发》
2016年第8期78-80,共3页
Mechanical Management and Development
关键词
煤矿
综采工作面
设备安装
工艺优化
coal mine
fully mechanized coal mining face
equipment installation
process optimization