摘要
结合隧道浅埋段对盖挖法开挖施工和初期支护施工方案进行了介绍,实践证明,该方法节省投资,缩短工期,保护环境。
Combined with the shallow buried tunnel segment for cover at the beginning of the excavation and excavation method construction schemes are introduced, the practice proved this method to save investment, shorten the construction period, protecting the environment.
出处
《工程建设与设计》
2016年第8期168-170,共3页
Construction & Design for Engineering
关键词
浅埋隧道
盖挖法
施工技术
shallow buried tunnel
excavation method
construction technology