浅谈船舶建造过程修改工时定额的影响因素 被引量:2

Discussion of Factors Affecting Quota Man-hour Modification during Shipbuilding Process
下载PDF
导出
摘要 文章分析了船舶建造中因过程修改而新增的工时定额的影响因素。当今船舶行业,随着工艺和技术等各方面的改进,船舶建造过程中的修改也越来越少。成本控制在船舶建造过程中的重要性众所周知,一个企业围绕着降本增益的主题来开展日常工作。船舶建造过程的成本控制是非常重要的,而建造过程中的成本除了常规的船舶建造费用,还包括建造过程中的修改费用。修改过程的工时定额的制定对修改费用的控制直接相关,进而直接反映到整个船舶过程的建造费用。所以全面考虑影响修改工时定额的影响因素对准确制定修改定额工时有着重要的意义。 The Article analyzes the factors affecting the shipbuilding industry of ship construction process modifications due to the new quota man-hour. Today for the shipbuilding industry, with improved technology, modifications in ship construction process become less and less. The importance of cost control in ship construction process is known. A company does its daily work around less cost and more benefit. The cost control during shipbuilding is very important. The cost of the construction process, in addition to conventional shipbuilding costs, includes the changes during the construction process. The modification of quota man-hour is directly associated to the control of the modification cost, and then directly reflects to the cost of the whole construction process of the ship. So taking full account of factors affecting quota man-hour modification is of great significance to the accurate making of quota man-hour modification.
出处 《船舶标准化工程师》 2016年第4期43-45,共3页 Ship Standardization Engineer
关键词 船舶建造过程 修改 工时定额 影响因素 成本控制 shipbuilding process modification quota man-hour affecting factor cost control
  • 相关文献

参考文献3

  • 1杨一鸣.钢质船舶建造工时概预算定额编制与造价管理及工程经济分析评价实用手册[M].北京:中国交通科技出版社,2007.
  • 2舟山长宏国际船舶修造有限公司.设计修改及工装工时定额标准、计算标准[S]. 2015.
  • 3沈玲,张志英.船舶铁舾件工时定额估算方法研究[J].工业工程与管理,2011,16(4):96-102. 被引量:13

二级参考文献6

共引文献12

同被引文献7

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部