煤矿采空区电力杆塔自动调平液压系统可靠性设计 被引量:4

Reliability Design of Automatic Leveling Hydraulic System of Power Tower Above Coaf of Goal Mine
下载PDF
导出
摘要 鉴于煤矿采空区严重威胁电力杆塔的安全,提出了电力杆塔自动调平系统的方案,而自动调平液压系统是整个电力杆塔自动调平系统的关键部分,对液压系统的可靠性指标有了更高的设计要求。文中采用了降额设计和冗余设计的可靠性设计方法进行自动调平液压系统的设计,通过建立系统可靠性框图和数学模型对系统进行了可靠性预测,最后采用相对故障率法与相对故障概率法对自动调平液压系统进行可靠性分配,保证了自动调平液压系统的高可靠性。 In view of the fact that coal mining area threatened the safety of power tower,the project of automatic leveling system of power tower was proposed,while automatic leveling hydraulic system was the key part of automatic leveling system of power tower,which had a higher design requirement for the reliability index of hydraulic system. The reliability design method used to do the design of automatic leveling hydraulic system including drop design and redundancy design was adopted. Then the reliability prediction of the system was carried out by establishing the system reliability diagram and mathematical model. Then the relative failure rate method and the relative failure probability method were used to conduct the reliability distribution of the automatic leveling system ,which made the high reliability of the hydraulic system ensured.
作者 张毅 刘混举
出处 《机械设计与制造》 北大核心 2016年第8期150-153,共4页 Machinery Design & Manufacture
基金 山西省科技重大专项(20111101040-02)
关键词 自动调平 液压系统 可靠性设计 Automatic Leveling Hydraulic System Reliability Design
  • 相关文献

参考文献4

二级参考文献38

  • 1许仰曾,陆初觉.论液压元件的污染启动敏感度[J].液压与气动,1989,13(4):10-13. 被引量:7
  • 2岳小杰,王少萍,郭小和.基于可靠性的液压零部件一体化设计方法[J].机械设计与制造,2007(4):11-13. 被引量:2
  • 3张劲枫,易小冬.某型船调距桨装置液压系统的设计与制造[J].机电设备,2007,24(7):14-17. 被引量:14
  • 4曾声奎,赵延弟,张建国,等.系统可靠性设计分析教程[M].北京:北京航空航天大学出版社,2004:227-235.
  • 5赵静一,姚成玉.液压系统可靠性工程[M].北京:机械工业出版社,2011.
  • 6Yin P Y,Yu S S,Wang P P,et al. Task Allocation for Maximizing Reliability of a Distributed System Using Hybrid Particle Swarm Optimization [J]. The Journal of Systems and Software, 2007 (80): 724-735.
  • 7Gama A, Yskandar H. Reliability Oriented Task Allocation in Heterogeneous Distributed Computing Systems [C]//Ninth International Symposium on Computers and Communications, 2004:68-74.
  • 8Gamal A,Yskandar H. Task Allocation for Maximizing Reliability of Distributed Systems : A Simulated Annealing Approach [J]. Journal Parallel Distributed Computing,2006(66) : 1259-1266.
  • 9Liang Z T, Chen J J, Gao W, et al. Reliability Allocation of Large Spaceborne Antenna Deployment Mechanism System Using Unascertained Method [ C ]//lst International Symposium on Systems and Control in Aerospace and Astronautics . 2006 : 1098-1104.
  • 10Huang L,Yuan F,Xu Q. Lifetime Reliability-aware Task Allocation and Scheduling for MPSoC Platforms [C]//Design, Automation & Test in Europe Conference & Exhibition, Nice, 2009.

共引文献26

同被引文献32

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部