期刊文献+

金华站预报方案建模及洪水预报系统研制 被引量:1

Modeling and Development of Flood Forecasting System of Jinhua Station
下载PDF
导出
摘要 随着人类活动的加剧,金华江流域下垫面情况发生了很大变化,原有预报方案很难反映金华站洪水规律。从这一点出发,重新制定金华站洪水预报方案,将重要水利工程考虑到方案中,并在资料选取、预报根据站选择,以及参数率定的过程中充分论证,采用合理的方法消除资料不足、面雨量计算及土壤初值等误差因素对方案的干扰,取得了较为满意的效果。最后,采用组态化的免编程技术,建设金华站洪水预报系统,提高金华站洪水预报服务能力。 As Jinhua river basin has been greatly changed by human activities, the original forecast scheme is difficult to reflect the flood law of Jinhua Station. From this point, the flood forecasting scheme of Jinhua station is re-established by taking into account the major water pro-ject. With a full analysis and demonstration, a reasonable approach was used in data selection, rainfall station selection, and calibration to avoid error influence of insufficient data, areal rainfall calculation and initial moisture content of soil on scheme;the results were satisfactory. At last, the flood forecasting system of Jinhua Station was built by using configurable technology, which could improve the flood forecasting service ability of Jinhua Station.
作者 元晓华 王浩
机构地区 浙江省水文局
出处 《安徽农业科学》 CAS 2016年第16期254-255,274,共3页 Journal of Anhui Agricultural Sciences
基金 浙江省中小河流监测系统建设项目(中央投资 浙发改函[2012]358号)
关键词 预报方案 洪水预报系统 误差 组态化 金华站 Forecast scheme Flood forecast system Error Configuration Jinhua Station
  • 相关文献

参考文献1

  • 1中华人民共和国质量监督检验检疫总局,中国国家标准化管理委员会.水文情报预报规范:GB/T 22482-2008[S].北京:中国标准出版社,2008.

同被引文献4

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部