新形势下高速铁路无砟轨道施工技术难点研究 被引量:3

Ballastless Track Construction Technical Difficulties on High Speed Rail in New Situation
下载PDF
导出
摘要 新形势下,随着高速铁路建设迅速发展,对无砟轨道工程质量要求越来越高。但目前施工面临的技术难点主要体现在沉降控制、刚度控制、精度控制和线型控制等方面。为有效弥补这些缺陷与不足,工程建设中应采取有效的施工技术对策,重视沉降控制,确保施工材料质量,加强无砟轨道施工刚度和精度控制,并预防裂缝出现,落实施工技术管理措施。 Under the new situation, with the rapid development of high-speed railway construction of ballastless track project quality have become increasingly demanding.But the technical difficulties currently facing the construction is mainly reflected in the settlement control, stiffness control, precision control, linear control and so on.To effectively address these shortcomings and inadequacies, construction should take effective countermeasures construction technology, emphasis on settlement control, to ensure the quality of construction materials to strengthen the non-ballasted track construction rigidity and precision control, and prevent cracks, implementation and supervision of construction measures.
作者 叶智彰
出处 《建筑技术开发》 2016年第7期72-73,共2页 Building Technology Development
关键词 高速铁路 无砟轨道施工 沉降控制:线型控制 high-speed rail ballastless track construction sedimentation control linear control
  • 相关文献

参考文献5

二级参考文献27

  • 1徐雯,杨和礼.模糊决策在房地产建筑方案优选中应用[J].建筑管理现代化,2005,19(4):13-15. 被引量:8
  • 2张震,于天彪,梁宝珠,王宛山.基于层次分析法与模糊综合评价的供应商评价研究[J].东北大学学报(自然科学版),2006,27(10):1142-1145. 被引量:79
  • 3TZ216-2007,客运专线无砟轨道铁路工程施工技术指南[S].北京:中国铁道出版社,2007.
  • 4铁建设(2007)85号.客运专线无砟轨道铁路工程施工质量验收标准[S].北京:中国铁道出版社.2007.
  • 5中华人民共和国铁道部.TB10601-2009高速铁路工程测量规范[S].北京:中国铁道出版社,2009.
  • 6陈小平,王平,陈嵘.弹性支承块式无砟轨道的减振机理[J].铁道学报,2007,29(5):69-72. 被引量:30
  • 7中华人民共和国铁道部.TB10754-2010高速铁路轨道工程施工质量验收标准[S]. 北京: 中国铁道出版社,2010.
  • 8中华人民共和国住房和城乡建设部.JGJ/T283-2012自密实混凝土应用技术规程[S].北京:中国建筑工业出版社,2012.
  • 9国家铁路局.TB10621--2014高速铁路设计规范[s].北京:中国铁道出版社,2015.
  • 10铁道部工程管理中心.工管线路函[2012]159号,CRTS1II型板式无砟轨道工程施工质量验收指导意见(试行)[S].北京:铁道部工程管理中心,2012.

共引文献52

同被引文献5

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部