当侧线股道与正向股道的走行距离相差很大时,若按编制规范的标准进行LKJ数据编制,会发生LKJ数据超前。为此,查找问题形成原因,探讨解决措施,提出改进意见。
When the distance-to-go of a siding track is quite different from that of a main line track,LKJ data errors will occur if the data is prepared in accordance with the standards of compilation specification.To address the problem,the reasons are sought out in order to explore solution and some improvement measures are proposed.
出处
《铁道通信信号》
2016年第7期37-39,共3页
Railway Signalling & Communication
关键词
侧线股道
LKJ数据
距离
编制规范
Siding track
LKJ data
Distance
Compilation specification