基于时间延迟理论的海上风电机组不定期检修策略 被引量:10

Irregular Maintenance Strategy for Offshore Wind Turbines Based on Time-delay Theory
下载PDF
导出
摘要 由于海上环境特殊,海上风电机组发生故障时适宜采取部件整体更换方式。实施状态检修选取合适的更换周期是降低运维成本的一个有效策略,但海上状态监测和健康诊断等技术还不够完善。针对此问题,以海上风电场运维日志为基础,借鉴状态检修中设备存在潜在故障—功能故障间隔的思想,将时间延迟理论引入海上风电机组维修中,对部件从潜在故障到功能故障的发展规律进行建模,并在此基础上提出一种适用于海上风电机组的不定期检修策略,优化部件更换周期。案例分析表明,所述方法能够确定一组最优的运维策略,使部件单位运行成本期望值处于一个较低水平,同时灵敏度分析结果能对优化出的策略进行运行风险评估。 Due to the special operating environment for offshore wind turbines,it is often to replace parts as a whole when a failure occurs.Implementing condition-based maintenance and selecting suitable replacement cycles is an effective strategy for reducing operational costs.But the condition monitoring and health diagnosis technology overseas are not reliable.Aiming at the problem,based on operation and maintenance logs,and the time interval between potential fault and functional fault,the time-delay theory is introduced into the offshore wind turbine maintenance,and the law of development from potential failure to functional failure is modeled.Based on this,an irregular preventive maintenance strategy is proposed,and the parts replacement cycle is optimized.Case analysis shows that the proposed method can determine a set of optimal operational strategies,maintain the parts unit cost expectation at a low level.In the meantime,the results of sensitivity analysis can be used to make operation risk assessment for the optimized strategy.
出处 《电力系统自动化》 EI CSCD 北大核心 2016年第15期133-140,共8页 Automation of Electric Power Systems
基金 上海市科委科技创新项目(14DZ1200905) 上海绿色能源并网工程技术研究中心(13DZ2251900) "电气工程"上海市Ⅱ类高原学科 上海市电站自动化技术重点实验室资助~~
关键词 海上风电机组 运维日志 时间延迟 不定期检修 更换周期 offshore wind turbine log of operation and maintenance time delay irregular maintenance replacement cycle
  • 相关文献

参考文献9

二级参考文献199

共引文献304

同被引文献69

引证文献10

二级引证文献78

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部