陕西八方沟尾矿库坝体变形监测与成因分析 被引量:1

Shaanxi Eight Side Ditch Tailings Dam Deformation Monitoring and Analysis
下载PDF
导出
摘要 简单介绍了八方沟尾矿库变形观测网的布设原则及监测方法。通过对坝体的变形观测网多次观测资料的平差计算,进行了监测资料处理和精度分析,绘制观测点的变形图,分析了坝体的形变成因。监测测量成果分析说明:各级坝体水平位移处于相对稳定状态,垂直位移是因固结沉降引起的。提出了八方沟尾矿库安全运营建议。 The laying principles of Bafangshan tailings dam deformation observation network and the monitoring methods were introduced. Based on adjustment calculation of multiple observation data of the dam deformation observation network, monitoring data processing and precision analysis were carried out, and the deformation graphs for the observation points were drawn for the analysis of the dam deformation causes. The results of the monitoring and measurement showed that all levels of the horizontal displacement of the dam remained in a relatively stable state, and the vertical displacement is caused by consolidation. Safety recommendations was proposed for the operation of the Bafangshan tailings dam.
出处 《甘肃冶金》 2016年第4期119-122,共4页 Gansu Metallurgy
关键词 变形观测 GPS 监测成果处理 精度分析 成因分析 尾矿库坝体 deformation observation GPS monitoring results of processing precision analysis cause analysis tailings dam
  • 相关文献

参考文献5

  • 1GB/T18314-2009全球定位系统(GPS)测量规范[S].北京:中国标准出版社,2009.
  • 2GB50026-2007工程测量规范[S].北京:中国计划出版社,2008.
  • 3AQ2030--2010.尾矿库安全监测技术规范[S].北京:中国标准出版社,2009.
  • 4黄声亨.变形监测数据处理[M].武汉:武汉大学出版社,2003.
  • 5JGJ/T8-97,建筑变形测量规程[S].1998.

共引文献65

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部