CFG桩、桩间土和褥垫层一起形成CFG桩复合地基,内蒙古白音华一号露天煤矿项目中装车站基础采用CFG桩复合地基,通过此工程的具体设计,对其承载力和沉降量的计算进行总结分析。
CFG pile and soil between piles and cushion together form CFG pile composite foundation. Taking the CFG pile composite foundation in the loading station of Inner Mongolia Baiyinhua No.1 open-pit coal mine for an example, this article introduces the detailed design of the project and analyzes the calculation of its bearing capacity and subsidence.