期刊文献+

Long Chen Paper 800,000 t/a Base Paper Project Began Construction

Long Chen Paper 800,000 t/a Base Paper Project Began Construction
下载PDF
导出
摘要 The project of 1,500,000 t/a high quality paper board and100,000 kW cogeneration project in Hubei Long Chen Paper Co.,Ltd.(hereafter referred to as'Hubei Long Chen')invested by Long Chen Paper(China)Co.,Ltd.in Hubei Songzi began construction on June 6^(th),2015.The first phase of the project will construct three paper making production lines,one 400,000 The project of 1,500,000 t/a high quality paper board and 100,000 kW cogeneration project in Hubei Long Chen Paper Co., Ltd. (hereafter referred to as "Hubei Long Chen') invested by Long Chen Paper (China) Co., Ltd. in Hubei 5ongzi began construction on June 6th, 2015. The first phase of the project w construct three paper making production lines, one 400,000 t/a ner board production line, one 350,000 t/a corrugating medium paper production line and one 50,000 t/a paper tube base paper production cogeneration ne, the total capacity is 800,000 t/a. In addition, project also began to construct at the same time,
出处 《造纸信息》 2016年第8期115-115,共1页 China Paper Newsletters
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部