摘要
从负荷分级、负荷计算、高低压配电系统、应急发电机组等方面介绍了某银行高层办公楼的供配电设计,阐述了供配电设计中的注意事项,提出高层办公楼的供配电设计中应急发电机实际工程容量应适当放大,在选择强弱电井、变配电室、弱电机房、消防控制室时最好能考虑足够的容量,便于布置设备或布线。
Combining by a bank office building as an example,this paper introduced the design of power supply and distribution in high-rise office building,including load grading,load calculation,high and low voltage power distribution system,and emergency generator sets. The matters need attention of power supply and distribution design were elaborated. It is pointed out that the actual capcity of emergency generator should be appropriately increased in the design of power supply and distribution in high-rise office building. The adequate space capacities of strong and weak electricity well,transformation and distribution room,weak current equipment room and fire control room should be considered,which is convenient for arranging equipment or wiring.
出处
《现代建筑电气》
2016年第7期14-16,20,共4页
Modern Architecture Electric
关键词
高层办公楼
供配电设计
高低压配电系统
应急发电机组
high-rise office building
power supply and distribution design
high and low voltage power distribution system
emergency generator sets