摘要
在车辆和人力无法运输物料的输电线路施工塔位需架设货运架空索道,通过计算索道工况,为架设货运索道提供理论依据,从而提高货运索道运输安全可靠性。
The Cargo cable way is needed to build to transport materials in the situation with no way to transport materials by vehicle and manpower. Calculations for the cargo cable way are given in this paper to provide the construction of the cable way the theoretical base aiming to improve the reliability of the cargo cable way.
出处
《青海电力》
2016年第2期25-27,共3页
Qinghai Electric Power
关键词
多跨单循环索道
承载索
牵引索
返空索
计算
multi-span single cycle cable way
bearing cable
guide cable
return cable
calculation