期刊文献+

基于FS模型的设计施工总承包联合体领导-成员风险分配策略分析 被引量:14

Optimal Leader-follower Risk Allocation Strategies for Design-Build Coalitions Based on Fair Process and Social Preferences(FS)Model
原文传递
导出
摘要 合理的风险分配是实施设计施工总承包模式的重要保障。在分析联合体成员公平偏好的基础上,通过对FS模型的改进,构建了联合体牵头方与联合体成员之间的Stackelberg博弈模型,从联合体成员嫉妒负效用以及同情正效用两方面,对联合体牵头方的最优风险分配以及联合体成员的最优风险投入进行了均衡分析。最后,采用调研获取的参数分析了不同风险承担比例下联合体成员的公平偏好系数对联合体成员风险投入、联合体成员效用、联合体牵头方效用以及联合体整体绩效的影响。特别地,联合体成员应对不同风险分配方案时会产生不同心理偏好,低分配比例情景下嫉妒偏好的增强会提高自身效用但降低联合体牵头方的效用;高分配比例情景下嫉妒偏好的增强不仅会降低联合体成员效用还会降低联合体牵头方以及整体效用,相反,同情偏好对联合体绩效具有正向调节作用。 Design-build is proved to be a preferred project delivery method for infrastructure projects,yet how to design an appropriate and fair risk sharing mechanism within design-build coalition(DBC)is essential to achieve project success.Further,despite the well documented literature on risk allocation for infrastructure projects,prior research has largely neglected participants' social preference which is proved to be salience in affecting their attitudes,behavior and,in turn,decision-making process.Accordingly,participants' risk management behavior will be situational,which means they will response to the risk sharing mechanism based on their perception whether the allocation ratio is fair to them.To address the gaps,a quantitative approach is presented to analyze risk sharing arrangement in design-build project by considering DBC member's fairness preference.Fehr and Schmidt's inequity aversion(IA)model is integrated into the proposed risk allocation model.The objective of this paper is to derive results for DBC leader's optimal risk-sharing ratio and DBC members' optimal risk-management effort simultaneously.The derivation is based on solving a restrained optimization problem using the conception and methods from Stackelberg game theory.Analysis results show that:(1)DBC members are prone to different fairness preference(in terms of envy preference and sympathy preference)depending on the value of risk-sharing ratio;(2)DBC members' optimal risk investment decreases with the enhancement of IA level when DBC member is envy preference;(3)DBC members' optimal risk investment increases with the enhancement of IA level when DBC members are sympathy preference;(4)It is beneficial for DBC leader to allocate more risk-sharing ratio to DBC members as their levels of envious preference increase;(5)DBC leader can allocate less risksharing ratio to DBC members as their levels of sympathy preference increase.Practically,the article will benefit for those who write DBC negotiation with recommendations on risk allocation strategies.Theoretically,this research sheds a light on establishing optimal risk allocation via considering members' social preference,and fills the gaps where traditional risk allocation models are based on the hypothesis of completely rational person.Accordingly,literature is enriched by providing mathematical evidence on designing a fair risk allocation strategy and,in turn,future research directions are provided for scholars to explore empirical evidence to support notions proposed in this paper.
出处 《中国管理科学》 CSSCI 北大核心 2016年第7期43-53,共11页 Chinese Journal of Management Science
基金 国家自然科学基金资助项目(71300521 71301070 71301062 71471077 71571098) 教育部人文社会科学研究青年基金项目(12YJCZH020) 交通运输部建设科技项目(2013318282310)
关键词 设计施工总承包 联合体 Stackelburg博弈 FS模型 风险分配 design-build coalition stakelberg game theory FS model risk allocation
  • 相关文献

参考文献42

  • 1Flyvbjerg B. Over budget, over time, over and over again: Managing major projects [M]// Morris PWG, Pinto J K, Soderlund J. The Oxford handbook of project management. Oxford.. Oxford University Press, 2011: 321-344.
  • 2Flyvbjerg B. Whatiyou should know about megaprojects and why: An overview[J]. Project Management Journal, 2014, 45(2): 6-19.
  • 3Hartman F, Snelgrove P, Ashrafi R. Effective wording to improve risk allocation in lump sum contracts[J]. Journal of Construction Engineering and Management, 1997, 123(4):379- 387.
  • 4Khazaeni G, Khanzadi M, Afshar A. Optimum risk allocation model for construction contracts: Fuzzy TOPSIS approach[J]. Canadian Journal of Civil Engineering, 2012, 39(7):789- 800.
  • 5Lam K C, Wang Dan, Patricia T K, et al. Modelling risk allocation decision in construction contracts[J]. International Journal of Project Management, 2007, 25 (5) :485-493.
  • 6Levi S. Design-build project delivery[M]. Windsor: McGraw Hill Financial Inc. , 2007.
  • 7The Construction Management Association of America. An owner's guide to project delivery methods[R]. 2012 https://cmaanet, org/files/.
  • 8Barnes M. How to allocate risks in construction contracts[J]. International Journal of Project Management, 1983, 1(1): 24-28.
  • 9Abu-Hijleh S F. and Ibbs C W. Schedule-based construction incentives[J]. Journal of Construction and Engineering Management, 1989, 115(3):430-443.
  • 10Yeo K T, Tiong R L K. Positive management of differences for risk reduction in BOT projects[J]. International Journal of Project Management, 2000, 18(4) 257-265.

二级参考文献27

  • 1朱克江.经营者薪酬激励机制架构分析[J].唯实,2002(11):16-20. 被引量:9
  • 2董志勇.行为经济学中的社会公平态度与价值取向研究——以新加坡、中国上海和兰州为例[J].中国工业经济,2006(10):75-81. 被引量:9
  • 3Vanhoucke M,Debels D. The discrete time/cost trade- off problem: extensions and heuristic procedures [J]. Journal of Scheduling, 2007,(10) : 311-326.
  • 4Eshtehardian E, Afshar A, Abbasnia R. Fuzzy-based MOGA approach to stochastic time-cost trade-off prob- lem [J]. Automation in Construction, 2009, 18 (5): 692-701.
  • 5Pollack-Johnson B, Liberatore M J. Incorporating quali- ty considerations Into project time/cost tradeofI analysis and decision making [J]. IEEE Transactions on Engi- neering Management, 2006, 53(4): 534-542.
  • 6Lam K C, Ng S T. A cooperative Internet-facilitated quality management environment for construction [J]. Automation in Construction, 2006, 15(1):1-11.
  • 7Chan W K L,Wong F K W, Scott D. Managing con- struction projects in China-the transitional period in the millennium[J]. International Journal of Project Manage- ment, 1999, 17(4): 257-263.
  • 8Yung P, Lai L W C. Quality assurance in construction by independent experts: a case study of the efficiency performance of state-owned enterproses in china [J]. Environment and Planning B: Planning and Design, 2009, 36(4): 682- 697.
  • 9Chen Weitong, Chen T T. construction partnering in Critical Success factors for Taiwan [J]. International Journal of Project Management, 2007, 25(5): 475 484.
  • 10Meng Xianhai. Assessment framework for constructionsupply chain relationships: development and evaluation [J]. International Journal of Project Management, 2010, 28(7): 695-707.

共引文献47

同被引文献159

引证文献14

二级引证文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部