期刊文献+

品管圈活动在减少血常规报告延时率中的应用

Application of quality control circle activities in reducing delay rate on blood routine reporting
下载PDF
导出
摘要 目的探讨品管圈活动在减少血常规报告延时率的效果。方法成立品管圈活动小组,确定活动主题,制定活动计划,把握现状,设定目标,分析原因及制定对策并实施。结果血常规延时率由活动前的9.97%下降为活动后3.67%,目标达标率为129.1%,进步率为63.2%,差异有统计学意义(P<0.01)。结论品管圈活动能有效降低血常规报告延时率。 Objective To explore the application of quality control circle activities in reducing the delay rate on the blood routine reporting. Methods Quality control circle activities group was set up to determine the activity theme of reducing the delay rate on the blood routine reporting,and implemented through grasping status,set target,analyzed the cause and established countermeasures. Results The delay rate on the blood routine reporting was decreased from 9. 97% to 3. 67% after the intervention,target success rate of 129. 1%,progress rate of 63. 2%,there was statistical significant difference( P〈0. 01). Conclusions The application of quality control circle activities can effectively decrease the delay rate on the blood routine reporting.
出处 《齐齐哈尔医学院学报》 2016年第18期2340-2342,共3页 Journal of Qiqihar Medical University
基金 北京大学深圳医院种子基金项目(2015021)
关键词 品管圈 血常规 延时 Quality control circle Routine blood test Delay
  • 相关文献

参考文献9

二级参考文献69

共引文献88

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部