本文分析了福清梨洞水库2011年水库除险加固、2013年水库观测仪器更新对2011年前后水库变形观测数据造成的显著性差异。在此基础上,对大坝变形进行分析,得出大坝沉陷及位移趋于稳定的结论。
In the paper,the significant difference of reservoir risk removal and consolidation of Fuqing Lidong Reservoir in 2011 and reservoir observation instrument updating in 2013 on reservoir deformation observation data around 2011 are analyzed. On the basis,dam deformation is analyzed for obtaining the conclusion of dam settlement and displacement tending to stability.
出处
《中国水能及电气化》
2016年第7期37-41,共5页
China Water Power & Electrification
关键词
梨洞水库
土石坝
变形分析
Lidong Reservoir
earth and rockfill dam
deformation analysis