基于蒙特卡罗模拟的水电BOT项目特许期决策 被引量:2

Concession Period Decision of Hydropower BOT Project Based on the Monte Carlo Simulation
下载PDF
导出
摘要 为合理测算水电BOT项目特许期,综合运用净现值法和蒙特卡罗模拟方法,构建水电BOT项目特许期决策仿真模型。首先综合考虑水电BOT项目建设运营方式与特点,采用净现值法构建项目特许期决策模型;然后分析项目建设运营风险因素,将影响特许期的关键性因素分为确定和不确定两类;最后基于影响因素的概率分布特点采用蒙特卡罗方法对特许期决策模型进行求解,计算水电BOT项目的合理特许期,并着重分析了年发电量和上网电价变动对特许期的影响。结果表明:该模型在水电BOT项目特许期决策中有着较好的适用性,可以为政府和企业投资与运作水电BOT项目提供决策参考。 In order to reasonably measure the concession period of hydropower BOT project, the concession period decision simulation modelof hydropower BOT project was built by using the net present value method and Monte Carlo simulation method integrity. Firstly, with theconsideration of the operation way and the characteristics of hydropower BOT project, a concession period decision model was built byadopting the net present value method. And then the key factors which influence the concession period were divided into certain and uncertainby analyzing the risk factors of the construction and operational characteristics of the hydropower BOT project. Finally, the concessiondecision model was simulated based on the probability distribution of factors through using Monte Carlo methods to solve reasonableconcession period of Hydropower BOT projects, the change of the power generating capacity and feed-in tariff which influence the concessionperiod was analyzed emphatically. The results show that this model has a good applicability of the hydropower BOT project in decisions andcan provide a reference for the government and business to invest and operate the hydropower BOT projects.
出处 《人民黄河》 CAS 北大核心 2016年第8期136-139,144,共5页 Yellow River
基金 国家自然科学基金资助项目(51379110)
关键词 特许期 净现值法 蒙特卡罗模拟 水电BOT项目 concession period net present value method Monte Carlo method hydropower BOT project
  • 相关文献

参考文献7

二级参考文献30

  • 1秦旋.基于CAPM的BOT项目特许期的计算模型[J].管理工程学报,2005,19(2):60-63. 被引量:52
  • 2舒先林.中国石油企业海外投资风险及其规避[J].企业经济,2005,24(6):103-104. 被引量:26
  • 3张汉亚.我国水利投资和运行机制研究[J].中国水利,2006(1):20-24. 被引量:23
  • 4M.M. Kumarsawamy, X.Q. Zhang. Governmental role in BOT-led infrastructure development [ J ]. International Journal of Project Management, 2001,19,195 - 205.
  • 5谢识予.经济博弈论(第二版)[M].复旦大学出版社,2000..
  • 6Liyin Shen,Bowson K.H.Lee,and Zhihui Zhang. Application of BOT System for Infrastructure Projects in China [J]. Journal of Construction Engineering and Management, December 1996: 319-323.
  • 7K. A. K. Devapriya. F. Pretorius. The Economic Implication of Project Finance Arrangements for Boo/Bot Power Projects in Asia[J]. Journal of Construction Research, Vol. 3, No. 2 (2002): 285-309.
  • 8S.YE& R.K.L.TIONG. Government Support and Risk-return Trade-off in China's BOT Power Projects[J]. Engineering, Construction and Architectural Management 2000.7 (4):412-422.
  • 9Shen L. Y., Li H. and Li Q.M, Alternative Concession Model for Build Operate Transfer Contract Projects[J]. Journal of Construction Engineering and Management,2002,Vol. 128 No. 4, 326-330.
  • 10Shen, L. Y., and Wu Y. Z. Risk Concession Model for Build Operate Transfer Contract Projects[J]. Journal of Construction Engineering and Management, Vol. 131, No. 2:211-220.

共引文献103

同被引文献17

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部