矿山井巷工程预算编制 被引量:3

Budget Making of Sinking and Driving Engineering
下载PDF
导出
摘要 矿山井巷工程从设计到施工都是一个非常复杂的过程,地形地貌、气象条件、交通运输条件等均会影响矿山井巷工程各个阶段的进度、质量和造价控制。造价控制也是设计中较为关键的一个环节,它能全面反应整个矿山井巷工程从立项、设计、招投标、竣工验收等全过程的总费用。笔者指出矿山井巷工程预算的编制是一个系统全面的工作,只有掌握定额内容,了解一定的施工工艺,通过从预算到结算,再从结算到预算的不断总结,才能做到熟能生巧,真正掌握整个预算的编制。 The design and construction of sinking and driving engineering is very complicated. The schedule,quality and costs are affected by landform, meteorological conditions and transportation conditions. Cost control is a crucial part in design because it reflects the total costs in the project initiation, designing, bidding and completion acceptance. The budget making of sinking and driving engineering is comprehensive and thus it can be mastered only by grasping the quota, construction technology and continous summary.
出处 《有色金属设计》 2016年第1期61-64,共4页 Nonferrous Metals Design
关键词 矿山井巷工程 工程预算 预算编制 定额解读 sinking and driving engineering budget making budge quota quota interpretation
  • 相关文献

参考文献4

  • 1中色协科字[2013]178号,矿山井巷工程预算定额[G].北京:中国有色金属工业协会,2013.
  • 2有色矿山井巷工程预算定额问题解答[Z].北京:中国有色金属工业工程建设定额站,2008.
  • 3候鹏翔.采矿设计手册(井巷工程卷)[M].北京:中国建筑工业出版社,1989.
  • 4蒋传辉.建设工程造价管理[M].江西:江西高校出版社,1996.

同被引文献27

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部