基坑混凝土支撑轴力监测数据异常情况分析与探讨 被引量:25

Analysis and Discussion of Monitoring Data Anomaly of Axial Force for Concrete Support of Foundation Pit
下载PDF
导出
摘要 为研究混凝土支撑轴力监测数据中出现的异常情况,探讨其解决方法,依托正处于主体结构开挖阶段的武汉市轨道交通8号线徐家棚站,深入分析施工过程中发生的一次混凝土支撑轴力监测数据报警事件,研究监测报警数据的合理性,结合其他监测项目并与类似工程案例对比,得到:1)建议选取混凝土浇筑并养护完毕、基坑开挖之前的轴力值作为初始应力值;2)温度对轴力有较大影响,应结合其他监测项目协同分析;3)目前采用钢筋计进行混凝土支撑轴力监测的方法在准确度上还有所欠缺。结合分析,给出了应对措施和建议。 The analysis and discussion are made on monitoring data anomaly of axial force for concrete support of Xujiapeng Station on Line No.8 of Wuhan Railway Transit.The rationality of monitoring data alarming is studied;comparison among similar projects is made;and some countermeasures are discussed.Some conclusions are drawn as follows:1)The axial force of concrete support measured after concrete casting and curing and before foundation pit excavation should be taken as initial value.2)The temperature affects the axial force obviously.3)The precision of reinforced bar gauge used for concrete support axial force monitoring is not good.Finally,some countermeasures and suggestions are given.
作者 张哲
出处 《隧道建设》 北大核心 2016年第8期976-981,共6页 Tunnel Construction
关键词 地铁车站 基坑工程 混凝土支撑轴力监测 监测数据报警 异常数据分析 Metro station foundation pit axial force monitoring of concrete support monitoring data alarming abnormal data analysis
  • 相关文献

参考文献14

二级参考文献61

共引文献468

同被引文献158

引证文献25

二级引证文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部