5POWRIE W,DALY M P. Centrifuge model tests on embedded retaining walls supported by earth berms[J].Géotechnique,2002,(02):89-106.
6DALY M P,POWRIE W. Undrained analysis of earth berrns as temporary supports for embedded retaining walls[J].Geotechnical Engineering,2001,(04):237-248.
7SMETHURST J A,POWRIE W. Effective-stress analysis of berm-supported retaining walls[J].Geotechnical Engineering,2008,(GE1):39-48.doi:10.1680/geng.2008.161.1.39.
8CLOUGH G W,DENBY G M. Stabilizing berm design for temporary walls in clay[J].Journal of the Geotechnical Engineering Division,ASCE,1977,(GT2):75-90.
9POTTS D M,ADDENBROOKE T I,DAY R A. The use of soil berms for temporary support of retaining walls[A].Thomas Telford,London,1993.440-447.
10POWRIE W,DAVIES J N,BRITTO A M. A cantilever retaining wall supported by a berm during temporary works activities[A].Thomas Telford,London,1993.418-428.