为了解决建筑施工现场不合理布局造成的成本和工期问题,采用系统布置设计的方法,对郑州国龙商务中心在建项目的施工现场平面布置进行分析,达到了降低材料二次搬运费等建筑成本的效果。
In order to solve the cost and project time which caused by unreasonable distribution on the construction site,the article proposed systematic layout planning,analyzed the layout of the under-construction project for Guolong Business Center in Zhengzhou,reduced the construction cost such as second removal cost of materials.
出处
《山西建筑》
2016年第24期100-102,共3页
Shanxi Architecture
关键词
建筑施工现场
SLP
设施规划
物流分析
construction site
SLP
facilities planning
logistics analysis