结合连云港田湾核电站5号与6号机组取水明渠的工程概况,制定了该工程的质量标准和目标,阐述了施工前、施工过程及施工后的质量控制措施,经实践证明,该工程质量的控制效果基本达到了预期值。
Combining with the survey at the water intake in open channels project of No. 5 and No. 6 Units at Tianwan Nuclear Power Station in Lianyungang,the paper makes out the quality standard and aims for the project,illustrates the quality control before the construction,during the construction process and after the construction,and proves by the practice that the controlling effect of the project can reach the expected value.
出处
《山西建筑》
2016年第24期200-202,共3页
Shanxi Architecture
关键词
核电站
取水明渠工程
质量控制
施工过程
nuclear power station
water intake in open channel
quality control
construction process