摘要
结合工作经验,从熟悉合同、查看图纸、进度计划、专项施工方案编制、技术复核等方面,阐述了项目施工准备阶段的技术管理措施,旨在通过技术手段提高经济效益,从而实现目标成本。
Combining with the work experience,the paper illustrates the technical management measures at the program construction preparation from the familiarity with contracts,map checking,progress planning,special construction scheme compilation,and technical rechecking,so as to improve the economic benefits with the technical measures and realize the cost target.
出处
《山西建筑》
2016年第24期246-247,共2页
Shanxi Architecture
关键词
现场管理
技术管理
施工方案
进度计划
site management
technical management
construction scheme
progress planning