摘要 莲花台车站是天水至平凉铁路线上的一处会让站,车站两端咽喉位于隧道内,中部位于桥上,而隧道内车站道岔区整体道床设计国内尚无工程先例;同时,桥隧过渡段轨道结构及加固处理措施具有一定代表性。本文结合相关规范、新型道岔的研制及工程实际,提出了莲花台车站铺设CRTSⅠ型双块式无砟轨道的设计方案与相应的施工方案。 Lianhuatai station is one passing station in Tianshui-Pingliang railway,both ends of the station are located in the tunnel and the middle part of the station lies on a bridge,and there is no domestic engineering precedent for the monolithic track bed design of station's turnout area inside the tunnel. The track structure of bridge and tunnel transition area and reinforcement measures are representative in China. By combing with the relevant specification,newpattern turnout development and engineering practice,the design and corresponding construction scheme for Lianhuatai station which laid CRTS Ⅰ double-block ballastless track were presented in this paper.
作者 莫荣韩
出处 《铁道建筑》 北大核心 2016年第7期118-122,共5页 Railway Engineering
关键词 天(水)平(凉)铁路 会让站 整体道床 设计 Tianshui-Pingliang railway Passing station Monolithic track bed Design
  • 相关文献

参考文献4

  • 1铁道第四勘察设计院.铁路工程设计及技术手册:站场及枢纽[M].北京:中国铁道出版社,2006.
  • 2中国铁道科学研究院.客货共线铁路12号无砟道岔设计报告[R].北京:中国铁道科学研究院,2015.
  • 3铁道部经济规划研究院.高速铁路CRTSI型双块式无砟轨道隧道地段通用参考图[Z].北京:铁道部经济规划研究院,2011.
  • 4王红亮.隧道内CRTSⅠ型双块式无砟轨道轨排框架法施工工艺[J].铁道建筑,2012,52(4):81-84. 被引量:16