摘要 热电公用设备的信号需先进入热电公用和化学水装置的SERVER02,再通过DSA的方式通讯到热电联产装置的SERVER01,两套装置的SERVER连接在不同的交换机上,二者需经过交换机→网线→交换机的方式进行通讯。由于系统版本的限制和满负荷运转,DSA通讯频繁出现瞬时中断,影响了工艺操作及监控。 DSA data of public system in Congeneration installations need to first enter the SERVER02 of congeneration public and chemical water installations, then through the SERVER01 of Congeneration installations. Two sets of device servers connected to a different switch and the two required after switch, cable, switch mode of communication. Due to the limitation of the system version and the full load operation of the system, the DSA communication frequently appeared instantaneous interruption, which affected the process operation and monitoring.
作者 熊浩
出处 《广东化工》 CAS 2016年第15期208-210,共3页 Guangdong Chemical Industry
关键词 HONEYWELL DSA CISCO 系统负荷 通讯数据中断 HONEYWELL DSA CISCO system load communication data interrupt
  • 相关文献

参考文献1

  • 1Honeywell. ExperionServer And Client Configuration Guide. 2008.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部