摘要
对某航段航线获取的大洋热液沉积物选矿尾矿进行了系统的工艺矿物学研究。该尾矿中有价金属元素铜损失严重,含铜为6.06%。铜矿物是以氯铜矿为主,另有微量的硫化铜矿物,其中氯铜矿多以单体形式损失,硫化铜矿物以细粒、微粒包裹体形式赋存在滑石等脉石中。尾矿中的铜经浮选—重选回收效果差,需采用冶金方法对其进行有效的回收。
The process mineralogy of the tailings separated from sea-floor hydrothermal sediment from the TVG21 routes was carried out. The loss of valuable element Cu in the tailings is serious, and its grade goes up to 6.06%. The research results show that copper minerals in the railings are mainly atacamite, followed by traces of copper sulfide minerals ; And atacamite losses mainly in the form of liberated particles, while copper sulfide miner- als are mainly included as fine or micro-fine particles in talc or other gangues. This means that hydrometallurgy process should be more effective for the recovery of Cu than mechanical beneficiation process.
出处
《矿冶》
CAS
2016年第4期77-79,共3页
Mining And Metallurgy
基金
西南印度洋多金属硫化物合同区资源评价(DY125-11-T-02)
关键词
尾矿
损失铜
氯铜矿
回收
tailings
copper losing
atacamite
recovery