期刊文献+

瓦村水电站工程移民实物分解信息管理系统的研究及应用 被引量:1

Study and application of resettlement real object decomposition information management system for Wacun Hydropower Project
下载PDF
导出
摘要 针对瓦村水电站工程水库建设征地及移民安置工作涉及土地、人口、房屋等实物指标量大面广,工作重复繁重的特点,研究开发了瓦村水电站移民实物分解信息管理系统,介绍该系统的研发要点及功能。从应用效果看,该系统能有效地管理、查询和处理实物指标及文档资料,并生成补偿协议及移民手册,大大提高了实物分解的工作效率。 The Rand acquisition and resettlement required for construction of Wacun Hydropower Project involves land, population and houses etc. The real object indexes are characterized by wide range and large volume, requiring repeated and heavy management work. A real object decomposition information management system was developed in view of these problems. An introduction was made on the key developing points and functions of this system. The effects of application demonstrate this system permits effective management, inquiry and processing of real objects and documents, automatic generation of compensation protocol and resettlement manual, which greatly im- prove the efficiency of real object decomposition work.
作者 覃永良
出处 《广西水利水电》 2016年第4期73-75,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 水库移民 技施阶段 实物分解 管理系统 瓦村水电站 Reservoir resettlement construction stage real object decomposition management system Wacun Hydropower Project
  • 相关文献

参考文献3

  • 1广西水利电力勘测设计研究院.广西田林瓦村水电站工程初步设计阶段建设征地移民安置规划设计报告(审定本)[R].南宁:广西水利电力勘测设计研究院,2012.
  • 2SIA42-2009,水利水电工程建设征地移民实物调查规范[S].
  • 3SL290-2009,水利水电工程建设征地移民安置规划设计规范[S].

共引文献12

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部