地铁区间叠线隧道下穿洪湖盾构法施工技术 被引量:4

Construction Technology of Overlapped Metro Tunnel Traversing Hong Lake by Shield Tunneling
下载PDF
导出
摘要 以深圳地铁7号线笋洪区间为工程背景,在分析下穿洪湖施工风险的基础上,结合现场施工工艺试验,建立了地铁区间叠线隧道下穿湖泊盾构法施工技术体系,包括砂层围堰排水和注浆加固处理、浅覆土筑岛、上软下硬地层复合盾构掘进、叠线隧道夹层土注浆加固和下隧道内设移动支架的综合施工技术,为今后类似工程提供技术参考。 Taking the section from Sungang Station to Hong Lake Station of Shenzhen Metro Line 7 as the engineering background, a framework of construction technology for overlapped tunnel traversing Hong Lake by shield tunneling was established based on the analysis of construction risks of traversing Hong Lake and the field test of construction technology, which includes sand layer treated with cofferdam drainage and grouting reinforcement, shallowly covered island, upper-soft-lower-hard ground constructed with composite shield, overlapped-tunnel built with grouting reinforcement of sandwich soil and mobile steel structure in the lower tunnel. This comprehensive construction technology will provide references for similar projects in the future.
出处 《筑路机械与施工机械化》 北大核心 2016年第8期77-79,共3页 Road Machinery & Construction Mechanization
基金 浙江省公益技术研究社会发展项目(2014C33054) 宁波自然科学基金项目(2015A610301)
关键词 地铁 区间叠线隧道 复合盾构 风险分析 metro sectional overlapped tunnel composite shield risk analysis
  • 相关文献

参考文献10

二级参考文献61

共引文献322

同被引文献32

引证文献4

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部