期刊文献+

补连塔煤矿大采高综采工作面过冲刷带技术研究 被引量:5

Scouring zone crossing technology in high cutting fully mechanized face of Bulianta coal mine
下载PDF
导出
摘要 补连塔煤矿在五盘区12煤综采工作面巷掘进期间揭露了冲刷带,由于冲刷带分布延伸情况不明确,为了优化生产组织保障安全高效生产,保证工作面正常回采,补连塔煤矿对冲刷带进行了探测分析,并根据实际情况确定工作面最终的布置形式和生产方式。实践证明,该技术降低了生产成本及安全风险,最大限度地回收了煤炭资源。 During the excavation of fully mechanized working face in No. 5 panel of No. 12 coal seam, the scouring zone was revealed. As the distribution of scouring zone is not clear, in order to optimize production organization, ensure the safe and efficient production, and guarantee the regular coal recovery, the scouring zone is detected, and the final layout of working surface and production methods are determined according to the actual situation.
作者 迟国铭
出处 《煤炭工程》 北大核心 2016年第8期50-53,共4页 Coal Engineering
关键词 冲刷带 定向钻探 跳采 缩面 浅孔预裂 scouring zones directional drilling skip mining face shortening shallow bore hole presplitting
  • 相关文献

参考文献9

二级参考文献23

共引文献58

同被引文献35

引证文献5

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部