注浆加固技术在综放工作面过陷落柱的应用 被引量:8

Application of Grouting Reinforcement Technology along Subsided Column in Fully Mechanized Caving Face
下载PDF
导出
摘要 K8403综放工作面回风巷附近穿过陷落柱,为保证K8403工作面安全高效生产及最大限度安全回收煤炭资源,采用"注浆加固该陷落柱,加固巷道顶板"的措施使得工作面强过陷落柱。本文分析了注浆加固陷落柱的施工方案、工艺以及注浆量的确定,取得了显著的经济技术效益。 Subsided column crossed nearby ventilation roadway in K8403 fully mechanized caving face, in order to ensure the safety and high efficiency production of K8403 face and safely recover coal resources in maximum,measures of "grouting strengthen subsided column and strengthen roadway roof" had been taken to ensure subsided column cross face.The paper analyzed the construction scheme and technology of grouting reinforcing subsided column and determined grouting volume,which obtained remarkable economic and technological benefits.
作者 王晋峰
出处 《江西煤炭科技》 2016年第3期74-76,共3页 Jiangxi Coal Science & Technology
关键词 综放工作面 陷落柱 注浆 施工工艺 fully mechanized caving face subsided column grout construction technology
  • 相关文献

参考文献7

二级参考文献45

共引文献256

同被引文献55

引证文献8

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部